Commodity | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 |
Railway/tramway track fixtures & fittings; mech...signalling, safety/traffi ... | $1,271,566 | $726,191 | $884,748 | $550,762 | $1,694,121 | $686,635 | $1,140,615 |
Total | $1,271,566 | $726,191 | $884,748 | $550,762 | $1,694,121 | $686,635 | $1,140,615 |
|
|